Simultaneous optimization of pipe and pavement renewal scheduling

  1. (PDF, 2 MB)
DOIResolve DOI:
AuthorSearch for:
Proceedings titleWorld Environmental and Water Resources Congress 2013 : Showcasing the Future
ConferenceWorld Environmental and Water Resources Congress 2013, May 19-23, 2013, Cincinnati, Ohio
Pages967974; # of pages: 8
SubjectRenewal scheduling; pipe; pavement; deterioration; optimisation
AbstractMost urban distribution water mains are located under paved streets or roads. Despite an obvious interdependence between pipe and pavement deterioration, this interdependence has not yet been considered in frameworks that would optimize both simultaneously, which is the issue addressed in this paper. The deterioration processes of both pipe and pavement are considered to be deterministic, and some assumptions are made about the interactions between pipe breakage frequency and pavement condition. Total life cycle costs of both pipe and pavement are computed as the discounted costs of an infinite series of perpetual renewal cycles. Genetic Algorithm (GA) is used to find the (near) least cost strategy for scheduling multiple pipes and pavements in a network.
Publication date
PublisherAmerican Society of Civil Engineers
AffiliationConstruction; National Research Council Canada
Peer reviewedYes
NRC number56101
NPARC number21268864
Export citationExport as RIS
Report a correctionReport a correction
Record identifier15c12000-da01-4ae0-bce1-0d7e1b024eb6
Record created2013-11-20
Record modified2016-05-09
Bookmark and share
  • Share this page with Facebook (Opens in a new window)
  • Share this page with Twitter (Opens in a new window)
  • Share this page with Google+ (Opens in a new window)
  • Share this page with Delicious (Opens in a new window)