Lecture Notes and Memoranda Prepared at Steep Rock Lake, Ontario

Download
  1. (PDF, 4 MB)
DOIResolve DOI: http://doi.org/10.4224/20331377
AuthorSearch for:
TypeTechnical Report
Series titleReport (National Research Council Canada. Division of Building Research); no. DBR-R-13
Physical description35 p.
AbstractThe following notes have been written after study of a plan presented by Mr. W. Samuel regarding the clay stripping from the South end of the "B" Orebody. Mr. Samuel proposes to reduce the varved clay to a level of approximately 1145 feet in two operations, the clay so removed flowing to Falls Bay. The slopes to the pit are then to be formed by sluicing and pumping the material to Falls Bay. Modifications to this plan are suggested, modifications which call for less removal of material. Limiting heights of banks for particular slopes of banks are also suggested.
Publication date
PublisherNational Research Council Canada
LanguageEnglish
AffiliationNational Research Council Canada
Peer reviewedNo
NRC numberNRC-IRC-8036
NPARC number20331377
Export citationExport as RIS
Report a correctionReport a correction
Record identifier68d744d0-8207-40bf-b47f-ff59f6521fea
Record created2012-07-18
Record modified2017-06-29
Bookmark and share
  • Share this page with Facebook (Opens in a new window)
  • Share this page with Twitter (Opens in a new window)
  • Share this page with Google+ (Opens in a new window)
  • Share this page with Delicious (Opens in a new window)