Integrating numerical tools in underground construction process

Download
  1. (PDF, 342 KB)
  2. Get@NRC: Integrating numerical tools in underground construction process (Opens in a new window)
DOIResolve DOI: http://doi.org/10.1108/09699980910970851
AuthorSearch for: ; Search for: ; Search for: ; Search for: ; Search for: ; Search for:
TypeArticle
Journal titleEngineering Construction and Architectural Management
Volume16
Issue4
Pages376391; # of pages: 16
SubjectConcurrent engineering, underground structure, numerical simulation
AbstractIn Algeria, the time frame for the execution of a construction project is rarely respected because of organizational problems and uncertainties encountered while the execution is underway. A case study on the construction of a metro station is used as a pilot project to show the effectiveness of replacing traditional construction processes by more innovative procedures.
Publication date
LanguageEnglish
AffiliationNRC Institute for Research in Construction; National Research Council Canada
NoteTH1 E58 MAIN
Peer reviewedYes
NRC number51263
20288
NPARC number20374462
Export citationExport as RIS
Report a correctionReport a correction
Record identifieraa9292e6-e340-4e57-ba17-48ea6d4f77bc
Record created2012-07-23
Record modified2016-05-09
Bookmark and share
  • Share this page with Facebook (Opens in a new window)
  • Share this page with Twitter (Opens in a new window)
  • Share this page with Google+ (Opens in a new window)
  • Share this page with Delicious (Opens in a new window)