Case Studies to Determine the Man-Hours Required to Construct the Concrete Frames of Tall Buildings in Summer and Winter

Download
  1. (PDF, 1 MB)
  2. Get@NRC: Case Studies to Determine the Man-Hours Required to Construct the Concrete Frames of Tall Buildings in Summer and Winter (Opens in a new window)
AuthorSearch for:
TypeArticle
Journal titleBuilding Research Note
ISSN0701-5232
Volume70
Pages6
SubjectConcrete
AbstractOne of the variants that must be taken into account is the number of man-hours required to carry out the operation under both summer and winter conditions. Unfortunately, it would appear that there are no reliable figures available for factors such as this. Thus the present study was undertaken in an effort to obtain some indication of the relative productivity of winter and summer operations.
Publication date
LanguageEnglish
AffiliationNRC Institute for Research in Construction; National Research Council Canada
Peer reviewedNo
IdentifierBRN-70
NRC number6036
NPARC number20358819
Export citationExport as RIS
Report a correctionReport a correction
Record identifierb42048c1-bff1-416a-b16c-a087f23cb749
Record created2012-07-20
Record modified2016-05-09
Bookmark and share
  • Share this page with Facebook (Opens in a new window)
  • Share this page with Twitter (Opens in a new window)
  • Share this page with Google+ (Opens in a new window)
  • Share this page with Delicious (Opens in a new window)