Earth Pressures on Ottawa Outfall Sewer Tunnel

Download
  1. (PDF, 1 MB)
DOIResolve DOI: http://doi.org/10.4224/20338217
AuthorSearch for: ; Search for:
TypeTechnical Report
Series titleInternal Report (National Research Council Canada. Division of Building Research); no. DBR-IR-340
Physical description23 p.
SubjectSewers
AbstractIn 1961, the Soil Mechanics Seciton installed earth pressure cells in a tunnel driven through sensitive Leda clay in the City of Ottawa. This report describes in detail the instrumentation and gives in summary the observations obtained over a 5-year period.
Publication date
PublisherNational Research Council Canada
LanguageEnglish
AffiliationNational Research Council Canada
Peer reviewedNo
NRC numberNRC-IRC-7524
NPARC number20338217
Export citationExport as RIS
Report a correctionReport a correction
Record identifierd4472342-1e8a-4505-8318-46e88f93dd42
Record created2012-07-19
Record modified2017-06-29
Bookmark and share
  • Share this page with Facebook (Opens in a new window)
  • Share this page with Twitter (Opens in a new window)
  • Share this page with Google+ (Opens in a new window)
  • Share this page with Delicious (Opens in a new window)